
Advance
Reclamation Engineering
We have begun the process of draining parts of the Myzeqe marshes to create even more fertile farmland. This engineering feat not only increases our tax base but allows us to construct permanent roads through what was once impassable bog.
National SovereigntyAdvancerequiresPotential
Is or was
Mataranga
MatarangaExact conditions
Advance tree
Monthly Development+0.002
Requires 2
Advances
National SovereigntyAbsolutismRequires
Countries
MatarangaPotential
Belongs to 1
AbsolutismAge
icon = expanded_supply_trains




