
Advance
Suez Canal Project
Survey and begin construction of a channel through the Isthmus of Suez, opening a direct route between the Mediterranean and the Red Sea.
Unlocks the Construct the Suez Canal Decision, which requires us to hold both Suez and Tinnis.
Advance tree
It has no requires, so the game files don’t say where this goes. When the game builds the
Absolutism tree, it adds this at the end of a branch with room for it, in the same spot in every campaign.
potential = {
original_capital ?= {
OR = {
}
}
}
allow_children = no
